Table Mountain
Casino & Hotel

Location:
Friant, CA
Installation Date:
2020

Owner:
Table Mountain Rancheria of California

Engineer:
NV5 Engineering

Contractor:
Teichert Construction
In 2020, the Table Mountain Casino decided to double its gaming floor space to 110,000 square feet and added a 151-room, 14-floor resort hotel, event center and bingo hall.

PRODUCTS USED

Pre-cast concrete pipe and basins were specified for the project, but were not feasible because of various grades and elevations. The quick solution was ADS products.

The Nyloplast Water Control Structure can be changed “on the fly”, which was perfect for the different elevations on the site. If the inlet sits above grade, the structure can be cut flush to grade. If the inlet is below grade, extensions can be added to the structure.

The flexibility of the Water Control Structure and its quick availability were key for the project. AdvanEdge pipe and N-12 pipe were utilized to collect and move the stormwater runoff. The pipe was buried at depths between 4’-12’ (1.2-3.6 m).