SC-160LP, SC-310, SC-740, DC-780 & SC-800 StormTech Design Manual

Filename:
SC-160LP, SC-310, SC-740, DC-780 & SC-800 StormTech Design Manual .pdf

SC-160LP, SC-310, SC-740, DC-780 & SC-800 StormTech Design Manual

This document is the SC-160LP, SC-310, SC-740, DC-780 & SC-800 StormTech Design Manual. The table of contents covers everything you need to know about the product in chapters.

Chapter 1 features the StormTech SC & DC Chamber may function as stormwater detention, retention, first-flush storage or some combination of these. The SC & DC specs outlined are size, chamber storage, weight, end cap storage with accompanying charts showing storage volume per chamber, amount of stone per chamber and volume of excavation per chamber. Cross section diagrams are detailed.

Chapter 2 provides product information. StormTech chamber systems have unique features to improve site optimization and reduce product waste. End caps have features that make the chamber system easy to design. Detailed figures are provided.

Chapter 3 is the structural capabilities with design approach, full scale testing, expert analysis, injection molding, polypropylene and polyethylene, and quality control tips.

Chapter 4 discusses the foundations for the chambers. StormTech chamber systems can be installed in various soil types. Guidance on foundation stones and depth is detailed.

Chapter 5 examines the cumulative storage volumes and the primary function of the outlet manifold.

Chapter 6 lists the required materials and row separations with an acceptable fill material table and cross section of the fill material locations. Photos show the system.

Chapter 7 discusses inletting the chambers with a treatment train, pre-treatment, the Isolator Row Plus System, enhanced treatment, the treatment train conclusion, other inlet options, lateral flow rates, perpendicular inletting, inlet pipe velocities and a table of standard distances. StormTech Isolator Row Plus Detail and a treatment train inlet system figure is included.

Chapter 8 explains the outlets for chambers. An outlet flow chart with figures detailing underdrains and outlets provided.

Chapter 9 covers other considerations like erosion control, site improvement techniques, conforming to site constraints and liners.

Chapter 10 shows the chamber sizing system for the SC & DC systems.

Chapter 11 are detail drawings of the inspection port, under drain and Inserta-TEE.

Chapter 12 is about inspection and maintenance. Photos and step by step maintenance procedure provided.

General notes, product and chamber specs are at the end.

Looking for something else?

View Document Library
Microsoft will be phasing out Internet Explorer soon. Because of this, we did not build the site to be used with IE. Please use Chrome, Edge or another browser to fully experience the new ADS website. .